.Movie_Snapshot.jpg?etag=W%2F%2226508-19c47c97130%22&sourceContentType=image%2Fjpeg&ignoreAspectRatio&resize=374%2B210&extract=0%2B0%2B350%2B210&quality=85)
Technical report and application regarding the EEJ status of waste rock. Changing the waste status of waste rock produced by the gold mine (No Longer Waste) so that it can be utilized, for example, in road and earthworks, as ballast for railways, and in other applications.

Kaustinen Region:
Biogas Guide
A biogas guide was compiled for the Kaustinen region, bringing together the region’s biogas scenario, market conditions, technologies, feedstocks, legislation, and future development prospects.
The guide was published in both digital and print formats. Check out the guide here.

Kaustinen Subregion: Regional Economic Impacts of Bioenergy Demand
A comprehensive study of the current state of the biogas market, its demand potential, and business conditions. The results of the study provided the region with a concrete overview of the demand for bioenergy, the factors influencing it, and its development prospects.

Ministry of the Environment:
Project Monitoring
Monitoring the implementation of projects under the RAKI and AHTI programs funded by the Ministry of the Environment. The project is being carried out in collaboration with Macon Oy.

Pyrolysis of sewage sludge and separately collected biowaste into biochar
A technical and economic study, including a practical pilot test on biochar production. The study included feasibility calculations for a suitable scale, as well as future visions and alternative technologies for sewage sludge treatment.

Kaustinen Region:
An Examination of Options for Utilizing Digestate
The study examined the utilization, processing options, and markets for digestate produced in the Kaustinen region. The project also included a cultivation trial, which provided additional practical information on the effectiveness of digestate as a growing medium.

Waste Management Monitoring and Surveillance Plan
Waste Management Monitoring and Surveillance Plan regarding the use of recycled materials received as waste in the manufacture of new fire-resistant products.
.

Closure of Hitura
Consulting related to the closure of the mine. Cooperation and coordination of work with authorities, the mining company’s bankruptcy estate, contractors, and consultants. Evaluation of closure and work plans as well as material quality; monitoring of completed structures and their environmental impacts.

BAT Comparison
BAT Compliance Report.
A detailed report for the regulatory authority on the compliance of a facility’s operations with the sector-specific BAT document

Baseline Study and Monitoring Plan
Baseline study of soil and groundwater for a facility subject to the Environmental Protection Act, as defined in Section 82 of the Act.
Preparation of a monitoring plan for monitoring the company’s environmental emissions.

Environmental Manager:
Environmental management and stakeholder engagement at the Pahtavaara mine. Continuous monitoring and assessment of the environmental impacts of the company’s operations. Assessment of the environmental impacts of future operations and preparation of environmental permits (preliminary monitoring of water bodies, EIA and permitting processes, long-term behavior of mining waste).
Development tasks related to the Finnish “Towards Sustainable Mining” reporting system, as well as support tasks for the reporting of mining and mineral exploration companies.

Regional Energy Advisory Services for Lapland, Kainuu, and Northern Ostrobothnia, 2019–2026.

Free and impartial energy counseling for vacation homeowners in South Savo (renewable energy and energy efficiency).

An assessment of the current state of heating energy consumption and an energy savings calculation were conducted for the company’s cottage village in preparation for a Leader investment grant application.

A comprehensive study of the current state of the biogas market, its demand potential, and business conditions. The results of the study provided the region with a concrete overview of the demand for bioenergy, the factors influencing it, and its development prospects.

A technical and economic study, including a practical pilot test on biochar production. The study included feasibility calculations for a suitable scale, as well as future visions and alternative technologies for sewage sludge treatment.
A business plan was developed for CircLab, a demonstration environment for nutrient recycling and future technologies. The plan identified potential customer types and outlined revenue models for them. Cost calculations were performed to support pricing.

Wastewater sampling at the Linnanmaa and Kontinkangas campuses.

Monitoring of stormwater
drained through the waste treatment center’s oil separator pits.

Preliminary monitoring of water bodies in connection with the Kopsan mining project

Monitoring the shooting range

Monitoring the shooting range

Sampling for emissions and water body monitoring in peat production in Kalajoki. Sampling of well water from peat production areas, surface water from water bodies, and diatom sampling.

Flotation processing tests on twelve samples from three different ore deposits. Compilation of composite samples, grinding and screening to the desired fineness, and conducting the flotation tests.

Monitoring and analysis of reactive water treatment basins.

Collection of moraine samples and determination of grain size using a sieving method.

Testing the purification capacity of activated carbon and biochar, and analyzing samples from water treatment pilot projects.

Operation of a container unit based on Weeefiner Oy’s water treatment technology at a landfill site.

Testing of water treatment chemicals.

Testing of laterite pretreatment

Pre-treatment of core samples

Pre-processing of rock samples

Project plan for the battery recycling park, formation of a consortium, funding application, and launch.

A project at the University of Oulu investigated the use of geopolymers made from recycled materials in water purification. Feasib was responsible for testing the geopolymers on both a laboratory and field scale.

An implementation plan was drawn up for a project aimed at supporting the work of the City of Ylivieska (the municipal organization, municipal group, and municipal community) as it prepares for the impacts of climate change. The project received funding in the fall of 2023.